When Is It Time for a New Roof?
Every roof has a lifespan. Clay tiles can last 50+ years, concrete tiles around 30-40 years, and metal roofing 20-30 years -but Malaysia’s tropical climate with intense UV, heavy monsoon rains, and high humidity can accelerate deterioration. If your roof shows multiple leak points, widespread tile damage, sagging, or structural concerns, full replacement is often more cost-effective than repeated repairs.
Roofing Man provides complete roof installation and re-roofing services across the Klang Valley. Whether you’re building a new home or replacing an aging roof, we deliver quality workmanship with materials suited to Malaysia’s conditions.
Our Roofing Material Options
Clay Tiles
The traditional choice for Malaysian homes. Clay tiles offer excellent durability (50+ year lifespan), natural heat resistance, and a classic aesthetic that suits most architectural styles. Heavier than alternatives, they require proper truss support.
Concrete Tiles
A cost-effective alternative to clay, concrete tiles come in various profiles and colors. They offer 30-40 years of service with good weather resistance. Slightly heavier than clay, they’re widely used in Malaysian housing developments.
Metal Roofing (Zinc/Deck)
Lightweight and quick to install, metal roofing is popular for extensions, commercial buildings, and modern home designs. Metal deck offers clean lines and lower structural requirements, though it requires proper insulation to manage heat and noise.
The Installation Process
Phase 1: Assessment & Planning
We begin with a thorough site assessment -measuring the roof area, evaluating the truss structure, and discussing your material preferences and budget. You receive a detailed quotation covering materials, labor, and timeline.
Phase 2: Preparation & Removal
For re-roofing projects, we carefully remove all existing roofing materials, including tiles, battens, and underlays. During this phase, we inspect the roof trusses for any structural issues -rot, termite damage, or weakened joints -and address them before installing new materials.
Phase 3: Installation
Our crew installs the new roofing system methodically, from underlays and battens to tiles or metal sheets. We pay special attention to flashing, ridge capping, and valley gutters -the areas where leaks most commonly develop.
Phase 4: Cleanup & Handover
After installation, we clean the worksite, remove all debris, and conduct a final inspection. You receive documentation of the work completed and any applicable warranty coverage.
Why Structural Inspection Matters
During re-roofing, we have a unique opportunity to inspect the hidden framework of your roof. In Malaysian homes, common structural issues include:
- Timber rot from prolonged moisture exposure
- Termite damage to wooden trusses and battens
- Joint weakening from age and thermal cycling
- Sagging sections indicating overloaded or undersized trusses
Catching these problems during replacement prevents far more expensive structural repairs later.
New Construction vs Re-Roofing
| Aspect | New Construction | Re-Roofing |
|---|---|---|
| Truss Work | Full new truss system | Reuse existing (if sound) |
| Timeline | Part of overall build | 3-10 days depending on size |
| Material Choice | Full flexibility | May be constrained by truss capacity |
| Cost Range | RM8,000 - RM50,000+ | RM5,000 - RM40,000+ |
| Structural Work | Built to spec | Inspection and repair as needed |
Why Choose Roofing Man?
- 10+ years of installation experience across the Klang Valley
- All major roofing materials -clay, concrete, metal
- Structural inspection included in every re-roofing project
- Free quotation with detailed material and labor breakdown
- Professional crew trained in safety and quality standards


